Intesys infrastructure, in São Paulo data centers
FrontEngine runs on equipment and IP addresses that belong to Intesys. This page shows where that infrastructure is, who holds each certification and what the mail flow actually uses.
Our own network
Intesys IP address ranges
Messages leave from addresses in the ranges
168.227.248.0/22and131.0.100.0/22, operated by Intesys. Delivery goes straight to the recipient's server, without passing through third-party sending services.Our own autonomous system
Intesys announces these ranges to the internet through its own autonomous system (ASN). Routing for the sending addresses is decided by us, not by a cloud provider.
Connectivity
Both data centers are carrier neutral and have IX.br present. The Intesys network uses transit carriers and internet exchange points available in these buildings.
DDoS mitigation at the edge
Attack traffic is filtered at the edge of the Intesys network, before it reaches the servers that receive your messages.
The two data centers
| Characteristic | Cirion SAO1 | Equinix SP3 |
|---|---|---|
| Location | Cotia, SP | Tamboré (Alphaville), Santana de Parnaíba, SP |
| Operator | Cirion Technologies | Equinix |
| Operator's Tier certification | Uptime Institute Tier III (Design + Constructed) | Uptime Institute Tier III (Design + Facility) |
| Power capacity | 20 MW | About 13.3 MW |
| UPS | 2N | N+1, block redundant |
| Diesel generators | 10, in 2N | 8, in N+1 with a swing unit |
| Cooling | N+1 | N+1 |
| Reachable carriers | More than 90 | More than 70 |
| Internet exchange points | IX.br on site | IX.br and Equinix Internet Exchange |
| Energy and building | 100% hydroelectric power | LEED Silver certified building |
| Use by FrontEngine | All of the mail flow | No mail flow today |
Building data as published by the operators. Intesys occupies colocation space in both; the buildings, power and cooling are operated by Cirion and Equinix.
The certifications belong to the operators
Data-center certifications belong to whoever operates the facility. Intesys holds none of them.
- Cirion SAO1: Uptime Institute Tier III for design and construction. Cirion also reports ISO 27001, ISO 22301, ISO 27701 and PCI-DSS certifications and SOC reports for its operation.
- Equinix SP3: Tier III for design and facility, and LEED Silver for the building. Equinix also reports ISO 27001, ISO 22301 and PCI-DSS certifications and SOC 1 and SOC 2 reports for its São Paulo facilities.
Tier III means that power and cooling components can be serviced without shutting down the equipment installed in the building. These certifications cover the building and the data-center operation. They do not cover Intesys's systems or FrontEngine.
How FrontEngine uses this infrastructure
| Component | How it runs today |
|---|---|
| SMTP and API submission | Several instances behind a load balancer, scaled automatically with demand |
| Database | Three instances with replication and a redundant connection pool |
| Cache | Three instances with automatic failover of the primary |
| Event bus | Three nodes with replication |
| Analytics event store | Replicas with redundant coordination |
| Object storage | Four nodes |
| Delivery to recipient servers | One process per IP pool, each a single instance |
All of it in the Cirion data center in Cotia. Some components still run as a single instance: the delivery process of each pool, the queue scheduler and the on-disk queue volume. A failure in one of them delays delivery until it recovers.
Backups and a single site
The database has continuous backup of its transaction log and a full copy every day. Backups are encrypted and sent outside the data center. The provider that stores them is in the subprocessor list.
Restoring from these backups has been rehearsed, and so has the deliberate failure of data plane components.
The mail flow runs at a single site, Cirion in Cotia. Intesys is also present at Equinix SP3, but FrontEngine does not keep a second site there able to take over sending. An outage of the Cotia site interrupts the service until it recovers.
What we do not claim
- Our own certification. Intesys holds no Tier, ISO, SOC or PCI certification. The ones on this page belong to Cirion and Equinix.
- An availability percentage. We do not publish a number yet. It will be published in the SLA once it has been measured and approved.
- Redundancy across sites. FrontEngine has no disaster recovery site for the mail flow.
- Backup of messages. The backups described above cover the database, not the message archive.
Want to assess the infrastructure with your team?
We answer technical and security questionnaires about the network, the data centers and how FrontEngine is operated.